OFFICIAL ADVERTISEMENT THE BOARD OF PUBLIC EDUCATION Of the SCHOOL DISTRICT OF PITTSBURGH Sealed proposals shall be deposited at the, Administration Building, Room 251, 341 South Bellefield Avenue, Pittsburgh, Pa., 15213, on March 11, 2014, until 2:00 P.M., local prevailing time for: PITTSBURGH BEECHWOOD PRE K-5 Elevator Addition General, Plumbing, Mechanical and Electrical Primes And the following on March 18, 2014, until 2:00 P. M., local prevailing time for: PITTSBURGH BRASHEAR H. S. Upgrade existing heat recovery unit Mechanical Prime PITTSBURGH PERRY H. S. New AC unit in principal's office General, Mechanical and Electrical Primes VARIOUS SCHOOLS PPS Phase 4 Security Projects - Groups 1, 2 and 3 Electrical Primes A pre-bid conference for Various Schools is scheduled for February 19, 2014 at 10:00 a. m. at the Facilities Division located at 1305 Muriel Street, Pittsburgh, Pa. This conference is NOT mandatory but recommended. Project Manual and Drawings will be available for purchase on February 10, 2014 for Beechwood and February 17, 2014 for all other projects listed at Modern Reproductions (412-488-7700), 127 McKean Street, Pittsburgh, Pa., 15219 between 9:00 A.M. and 4:00 P.M. The cost of the Project Manual Documents is non-refundable. Project details and dates are described in each project manual.
↧